What the Preventive Maintenance checks to be performed during turnarounds / Shutdown
1. Redundancy checking
a)
Power supply 24VDC for controllers, switches and
IO cabinet
b)
Controller redundancy
c)
Network switch redundancy
d)
Control firewall redundancy
e)
Server redundancy
2. Inspection of power distribution cabinets
·
Check Earthing connections, ideally it should be
zero, check earth pit
·
Visual inspection of MCBs, Voltmeter, Ammeter,
·
Inspection of power termination in each panel.
·
Check for voltages, 230VAC, 24VDC. Check for UPS
supply
3. Inspection of NTP Cabinet for DCS
Check power supply,
Check for diagnostics, fault alarms.
4. Filter cleaning – canopy filters top side;
normally 3 month and 6 months.
Important to maintain temperature of
cabinet.
5.
Cleaning of louvers, bottom, for sucking air
inside.
6. Check and inspection all cable terminations for network
switches, make sure cables are tightened properly.
7.
Carryout dressing of cabinet cable,
8.
Inspection of fans and panel lights, check and observe
noise if any.
9.
Clean all I/O modules, controllers, firwells,
switches, etc.
10 Clean all cabinets using vaccum cleaner
11 Cleaning of servers, and all operator
workstations
12Check and inspect acrylic Front protection
covers